Showing posts with label shawls. Show all posts
Showing posts with label shawls. Show all posts

Wednesday, November 8, 2017

Arizona State Fair 2017 Results

I didn't get a chance this year to go see the fair and see how I place.  I did pretty good.  My handspun got 2 first place and 1 second place.  My knitting got a first place and a fourth place.








Tuesday, June 27, 2017

Travelling Means Some Knitting Time

We did a short trip and it meant that I could work on some simple knits in the car.  Here is some progress shots.







Saturday, June 17, 2017

So Much Stuff and Not Enough Time

I'm still trying to finish a big sample knit.  It's 1200 yards.


It's the 5190 Miles Shawl.  I'm suppose to do another Everyday Shawl next so knitting time for me will be limited.

Meanwhile I'm trying to finish of this fiber before the start of Tour De Fleece which starts Jul 1st.



I started a bunch of projects too.







I also joined a KAL.  So far this is my progress luckily I have till Aug 15th to finish this colorwork hat.


Monday, April 24, 2017

Rinse and Repeat!

More samples for Backyard Fiber Works.  When I have samples to knit, I don't get much time for other knitting or spinning.


This is the Dot Shawl sample.  I ran out of the grey but just made the border bigger.  The pattern is here:  http://www.ravelry.com/patterns/library/dot-shawl.  I plan to make the larger size with the yarn below.






This Spokes Baby Blanket should get to Alice today.  The pattern is here:  http://www.ravelry.com/patterns/library/spokes-baby-blanket  Funny it was suppose to take the same amount of yarn of each color.  I had like 6 yards left of the white and like 1/2 a skein of the blue/green.  It takes according to the pattern 440 yards of worsted weight of 2 different colors.


Currently on the needles is an Everyday Shawl sample in a teal gradient.  Here is the pattern:  http://www.ravelry.com/patterns/library/everyday-shawl  I had to makes some modifications to the pattern.  I did kfb & pfb instead of YO.  I slipped 1 stitch before the marker instead of 2.  Can't wait to get to the other colors!


Meanwhile I did finish spinning my 8 oz of Woolgather.  Here is a resting shot.  I need to start plying it.


I have one more sample to do after the Everyday Shawl and then hopefully is back to finishing WIP and not starting more of them. LOL!



Tuesday, April 4, 2017

Sample, Sample!

I seem to be working full time on samples for Backyard Fiberworks.  Here is the finished Spotlight.  Luckily, Alice likes to block and weave in ends.  Which is a good thing because I can wait over a year to do that. LOL!


http://www.ravelry.com/patterns/library/spotlight-2
Backyard Fiberworks Sock in Silver Spring and Shell

I'm currently trying to finish up another 2 samples. 

 

http://www.ravelry.com/patterns/library/dot-shawl
Backyard Fiberworks Sock in Stormcloud and what I call After The Stormcloud (don't know if Alice will name it that).


http://www.ravelry.com/patterns/library/la-cumparsita
Backyard Fiberworks Orchard in Arbol

I will be working on:   http://www.ravelry.com/patterns/library/spokes-baby-blanket and http://www.ravelry.com/patterns/library/everyday-shawl

Meanwhile I did finish this hat and started on a shawl.



http://www.ravelry.com/patterns/library/astrea-hat  I've made 4 of these hats.  I should know the pattern by now but manage to mess up with each one!



I've had the yarn wound up for this shawl for a long time.  JulieSpins Vera Fingering in Pansies and Ruby.  I haven't gotten tot he Ruby part yet. http://www.ravelry.com/projects/AtPlayWithFiber/carson



After 2 years, I'm finally getting somewhere with this shrug.  I've been watching Netflix at night and needed something simple to knit on in the dark and watching.  I had rows and rows of just knitting and purling.  Now I need to pick up stitches and knit the body.


Thursday, March 16, 2017

FO and Another Sample Knit!


I got my test knit done.  It just needs to be washed and blocked.  It's the part I like least along with weaving in the ends.


I finally got my  Baa-ble Hat washed and blocked.  It's ready for my trip to Rhinebeck in the fall.


My  Drachenfels turned out HUGE but that is what you get when your "fingering" weight yarn isn't quite fingering weight.  I love it though and it will go in the county and state fair this year.


I got my Woolgathering off the wheel.  I can't wait to see how it plies up.


This is my latest sample knit.  It's Spotlight and it will be at Maryland Sheep and Wool Festival at the Backyard Fiberworks booth!!  If you remember just around Christmas, I won $100 gift certificate to Backyard Fiberworks.  I got some lovely yarn and just decided to ask Alice if she needed samples knitted.  She said yes!  She has some other shawls I will be knitting too.  This is Backyard Fiberworks Sock in Shell.  I soon will be adding Silver Springs.



Sunday, September 18, 2016

Yes, I Have a Problem

I'm almost done a test knit and I'm going to start another one today.


I'm on the last mosaic section of the Optimist Shawl test knit and then just a last lace section.


This is another Ambah design.  It's suppose to be knitted with a solid and gradient yarn.  I'm going to start with the brown, use the red for the bobbles and then finish off with the blue.


Tuesday, September 13, 2016

Wish Me Luck!


It's that time of the year again, County and State Fair!  Since I've won First Place in both fairs, the pressure is on to win again.  Last year I won Best Spinner.  I hope to win that again.  Below are my spinning entries.


On the left is Bee Mice Elf 100% BFL.  In the middle is Into The Whirled 50/30/20 Alpaca/Merino/Silk Blended Top. On the right is Loop! bump  Merino, nylon, and Angelina.



I didn't finish a pair of socks.  I've been just knitting vanilla socks so for the first time I didn't enter socks.  The socks usually win so I'm a bit worried.  I decided to submit some of my test knit hats instead and 2 shawls.  The dark blue green one is huge and took a long time (no rest rows on the back).  I hope to find out the results in November.


Wednesday, July 27, 2016

Back To the Regular Schedule



These socks need to be done for Christmas.  I finally finished one and started the 2nd one.  It's the 7 inches of ribbing that takes me forever.  I have to take breaks from it.




On the spinning front.  I got this BFL wool swirl at Maryland Sheep and Wool Festival.  It's called The Big O.  I'm not usually crazy about BFL but I love the colors and how it feels.




One of my big projects.  One more tentacle and then I can work the body of this Kraken scarf.




I seem to have one finished sock for all my sock projects.  This is recycling of yarn that was used for leg warmers.  One is done.  Working on the 2nd.  It's for someone with 10.5 size feet!




A beaded project.  I think I have 13 more repeats then it will be short rows and go a lot faster.


Thursday, June 16, 2016

When Is It Finished?

I considered my project to be done when the knitting it done.  I don't weave in the ends till after I block the project.  Some knitters don't consider an item done till its washed, blocked and ends weaved in.  I don't like blocking.  One of my issues is that I don't have much floor space to block.  Shawls take a lot of space.  I finally got around to washing & blocking a bunch of shawls that I've finished.  A few of these might be entries for the County and State Fairs.








Sunday, April 10, 2016

One Down, Three To Go

 
 
 
I got the socks done and they went to the new owner on Friday.  Meanwhile I still have  other projects to get done before May 6th.
 
 


This test knit is more then half way done.  It's due in May.



I'm on the last chart and see the end of this shawl.  Which I want to take with me and give to a friend in May.




This is a knit along that needs to be done for May too.  I'm more then half way through the yarn so it should be done soon.